Mehr anzeigenWeniger Anzeigen
At the beginning of the 18th century, the previous medieval bridge was destroyed by a flood of the Levenza River. In 1710, the Cometto masons, father and son, originally from Lugano, rebuilt the current bridge, which consists of a large, semicircular arch over the Levenza River with a significant diameter of 14.20 meters to withstand floods. On the right bank, a ramp on arches connects the current road (RD 43) and the bridge, crossing the floodable meadows at an angle of 110°. On the other...
Service
Öffnungszeiten
Das ganze Jahr über 2024 Geöffnet jeden tag
Lokalisierung
Gesprochene Sprachen
Umwelt
- Bergsicht
- Am Stadtrand
- Dorf in unter 2 km
- Überblick über Fluss
- Fahrradweg/-strecke in weniger als 500 m Entfernung